• Execution of energy efficiency and conservation measures in lighting and air conditioning for offices at 5, Fuencarral Street, Madrid.

  • Deployment of energy efficiency and conservation measures in lighting, air conditioning and control Scada at the Headquarters of the Revenga Group at 6, Fragua Street, Tres Cantos, Madrid.

  • Energy Saving and Efficiency measures carried out on a floor level of office space at No. 5 Salcedo Street in the district of Fuencarral (Madrid).  Owned by Siconet, Bull Group.
  • Rehabilitation and Energy Optimization at the Madrid Zoo Aquarium
  • Energy rehabilitation of the Madrid Zoo Aquarium office building (Phase I)
  • Energy rehabilitation of the new ISTRIA offices